Construction of a new industrial building for the company “Tserveli Argiri”, which includes a changing room floor, as well as independent huts for the accommodation of seasonal staff during the olive harvest season.
As part of the project, INOX stainless steel manholes were installed, equipped with an internal screen and an Ω-type arrangement, for effective drainage and retention of solid residues. At the same time, high-strength industrial clinker tiles were installed, with the application of a three-component grout, suitable for areas with increased hygiene, humidity and daily stress requirements.
The choice of specific materials ensures durability over time, easy cleaning and safe operation of the facilities.
Watch the video